-
Mar 18,2024
Influence of Construction Temperature on Hot-Melt Markings The construction temperature of hot-melt marking paint generally refers to the temperature of the marking car hopper, which usually requires that the material in the hopper should be maintained at 180-220 ° C. When the melt temperature of hot melt marking paint is too high, the volatilization of additives in the paint is accelerated. At th...
read more
-
Apr 07,2024
Why Two-Component Marking Paints Are More Suitable for Heavy Traffic Sections? There are roughly three types of road marking paint on the market, namely: waterborne marking paint, hot melt marking paint, and two-component marking paint. So, what are the differences between these types of markings, and which type is more suitable for heavy traffic sections? 1. The wate...
read more
-
Apr 28,2024
Detailed Process of Hot Melt Marking Construction 1. Road Cleaning Before construction, the nearby area must be cleaned to ensure that there are no impurities such as oil, water, fallen leaves, weeds, etc., so as not to affect the adhesion, smoothness, and reflective effect of the markings. 2. Full Scale Plotting During the setting out process, calculations and ...
read more